Performance Evaluation of Production Equipment: Case Study of AWB Utilization
Calculate equipment utilization rates from MTBF/MTTF and actual operating information! It is also possible to analyze how the utilization rate changes when switching to new equipment!
The AWB (Availability Workbench) can calculate the operating rates and lifecycle costs of production lines and production equipment based on equipment information (Note 1), and the following effects can be expected: ■ Expected Effects 1. Calculation of the expected operating rate as a production line when introducing new equipment. 2. Setting targets for each piece of equipment to meet the operating rate goals established in the production plan. 3. Estimation of vulnerable areas in production equipment and production lines and corresponding measures. Note 1: Examples of input equipment information - Degradation curves (Note 2) - Items related to maintenance - Required personnel - Operation costs, etc. Note 2: Can also be substituted with MTTF/MTBF or failure performance data.
- Company:ウェーブフロント 本社
- Price:1 million yen-5 million yen